Low voltage left off the master schedule
When the low voltage phases are not on the schedule, rough-in collides with insulation and drywall. Placing them early keeps the trades in order.
Home / Project Managers / Guide
Free guide for project managers and owner's repsLow voltage touches almost every phase of a project, from framing to closeout. This guide lays out the phases, the documents to ask for and the questions to settle early, so the technology scope stays on schedule and on budget.
Go through these before rough-in. Each one is easier and less expensive to plan on paper than to fix in a finished wall.
The five phases where technology decisions matter most.
Confirm scope, contacts and the schedule, and name one point of contact on each side.
Low voltage rough-in runs alongside framing and the electrical and mechanical trades.
Pre-wire is ready for inspection before insulation and drywall.
Devices and equipment are installed after paint and finishes.
Systems are commissioned, the punch list is completed and closeout documents are handed over.
These are the issues that most often cause rework, delays or a finished room that does not look the way it was designed.
When the low voltage phases are not on the schedule, rough-in collides with insulation and drywall. Placing them early keeps the trades in order.
Answers that are not written down are hard to defend later. Written RFI responses keep the record clean for everyone.
Added work done before it is priced creates budget disputes. Pricing every change in writing first keeps the budget under control.
Owners need to know what was installed and when. Records with installation and purchase dates make service and warranty claims straightforward.
If your question is not here, call 786.266.7676 and we will answer it directly.
One ITS project contact from kickoff through closeout, who answers questions and coordinates the field team.
Every change is priced in writing and approved before the work is done.
System documentation, owner training and warranty records that list both the installation date and the equipment purchase date for each item.
Yes. ITS works on luxury estates, high-rise residences, mixed-use and commercial buildings across Miami-Dade, Broward, Palm Beach and the Florida Keys.