Pre-wire and low voltage

Wired right before the drywall goes up.

ITS installs low voltage wiring and cabling for homes and businesses in Miami-Dade, Broward, Palm Beach County and the Florida Keys. Everything that runs on low voltage, from TVs and speakers to keypads, cameras, Wi-Fi and shades, needs its cable in the wall before drywall. Adding it later means cutting and patching finished walls. ITS works from your plans, runs and labels every cable, and works in an order that keeps low voltage off the critical path.

Every run labeledBuilder-friendly scheduleLicensed and insured
ITS Instagram post: 5 things to wire before the drywall goes up.
What it includes

Built around how you live.

Each system is priced from your plans or a walk-through of the home, with an itemized proposal by system and by room, and supported by ITS after you move in.

Device locations first

We confirm every TV, speaker, keypad, camera, access point and shade location before the first cable is pulled.

A standard for every TV

Every TV location gets three Cat6 cables and one RG6 coax, so it is ready for whatever is mounted there.

Labeled and documented

Every cable is labeled, so trim-out is faster and service is easier later.

Commercial

Structured cabling, cameras and access control for commercial buildings and showrooms.

From our Instagram

Seen on @innovativetechsolns.

Posts from the ITS Instagram on this topic. Follow along for new projects and tips.

ITS Instagram post: GCs, when to bring in low voltage so it does not hold up drywall.
How we work

Four clear steps.

This is the order we work in so low voltage does not hold up drywall.

STEP 01

Device locations

We confirm every device location before rough-in.

STEP 02

Pre-wire

Every cable is run and labeled after framing, before insulation and drywall.

STEP 03

Rough inspection

Where the permit requires it, the wiring is inspected while the walls are still open.

STEP 04

Trim-out and programming

Devices go in after paint, then the systems are programmed and tested.

Questions

Common questions.

If your question is not here, call 305.853.9119 and we will answer it directly.

What low voltage wiring does ITS install in South Florida?

Network and Wi-Fi access point cable, speaker and TV wire, camera, keypad and shade wiring, and the cable back to the equipment location, for homes and businesses in Miami-Dade, Broward, Palm Beach County and the Florida Keys. We confirm every device location with you and your designer before rough-in.

When should low voltage start on a new build?

While the plans are being finished, before framing is done. The pre-wire goes in after framing and before insulation and drywall.

What should be wired before drywall?

TV locations, speakers, keypads, cameras, Wi-Fi access points, shade wiring and the cable back to the equipment location. Adding them later means cutting finished walls.

What is a rough inspection?

Where the permit requires it, the inspector checks the low voltage wiring while the walls are open, before insulation and drywall.

Does ITS work with general contractors and project managers?

Yes. We work from the GC schedule and plan our work so low voltage does not hold up drywall.